releaseblog.railway.com ↗

Incident Report: September 30, 2026: Domain Routing Disruption

A pipeline race shipped Railway's new routing service before its schema migration: five minutes of 404s on new connections in every region, and migrations now run first.

railway.com · · 6m read

Railway title card on deep purple reading “Incident Report: September 30, 2026: Domain Routing Disruption”, with author Angelo Saraceno

Why we picked it · the editor's summary

At about 07:35 UTC on September 30, Railway's new routing service reached every region before the database migration it depended on, because the pipeline ran the two in parallel. Every route lookup queried columns that did not exist yet, and a recent change to the proxies' fallback meant they answered with 404 instead of the last known route. Routing recovered about five minutes later, when the migration finished, without a rollback. The fixes: migrations roll out in strict order, blue/green binary rollouts wait for their schema, and the control plane gets shard-based regional waves. If your pipeline can run a migration beside the code that needs it, check that ordering before it checks you.

Read on railway.com ↗

Comments

Loading comments…